Inspection Mandate

Specifications dictate our workflow

We inspect tolerances at the spindle, not after freight clears customs. Every lot undergoes physical dimensional checks and material verification.

100%

Lot Traceability

ISO 9001

Certified Audit

0

Tolerance Drift

Pipeline

Four-stage verification pipeline

01
02
03
04

Incoming Stock Check

In-Process CMM Pass

Optical Gauging

Pre-Freight Audit

Raw material batches verified against metallurgical mill test reports before floor release.

Coordinate measuring machine verification of critical geometric tolerances during fabrication.

Non-contact optical profiling for micro-components and complex semiconductor tooling.

Final lot documentation sign-off and secure container packing under direct Taipei oversight.

Uncompromising Policy

We do not negotiate on material certifications or delivery lead times.

Request sample inspection reports

Access vendor compliance dossiers and detailed CMM audit logs directly from our Taipei desk.